Parquet Installation Instructions

PubDate:2014-06-20   Views:763

First, the installation method of solid wood composite floor


1. Determine whether the ground is flat or not. Local leveling can be done for local unevenness. If there is a large area of unevenness, self-leveling should be considered. The installation and use effect of solid wood composite floors has a great relationship with the flatness of the ground.


2. If there is no problem with the ground, you can directly lay the floor after laying a special floor mat.


3. Solid wood composite floor has no keel, no nails, no glue. There should be an expansion joint of 8-12 mm between the floor and the wall, and spring steel sheets and springs should be added. Per 100 square meters: about 40 steel leaf springs and about 200 springs.


4. During the installation process, it is best to cover the installed part with cardboard or other things at any time, because many scratches happen like this. 5. Immediately clean up the floor after the end and do floor maintenance in time.



Second, the installation method of solid wood floor


1. Lay the keel, the spacing of the keel is determined according to the length of the floor. But it is best not to exceed 400MM.


2. Pay attention to check the keel fixation, be sure to check it carefully, once there is a problem with the keel fixation, it will be very troublesome to repair it later.


3. The keel installation should pay attention to leveling, and the concave and convex parts of the ground should be handled well. Whether the keel is leveled is related to the stability and comfort of the floor.


4. Floor installation methods are divided into 1/2 and 3.6.9. The specific situation is determined according to the room area and floor specifications. It is best to seek the advice of a carpenter, they are very experienced.


5. The keel is divided into two types: dry and wet. If you use wet wood, you must wait until the wood is completely dry before installing the floor.


6. Cover the installed part at any time to avoid scratches. 7. Do floor maintenance in time.